Garg Consulting Services, Inc. | |
|
ENGINEERS |
||
Southwest LRT Project, Denver - RTD
The Southwest corridor light rail line is a double-track system running from I-25 and Broadway Station to Mineral Avenue and South Santa Fe. The project involved design, furnishing and installation of a fully functional automatic block wayside signal system along the entire light rail alignment from South Broadway to Mineral Avenue.
GCS provided construction inspection services for the signal system involving testing, preparation of reports, and commissioning of the system. The signal system consisted of wayside signals, switch machines, train wayside connection cabling (both main and tail), impedance bonds, relay cases, cut-section AC track circuits, solid state logic control indications, electric locks, etc.
The major tasks of the project included:
|
![]() |
| ©2012 Garg Consulting Services, Inc. All rights reserved. | |